小萝莉影视

Lane and ramp closings on the Roosevelt Bridge start this weekend

.

If you use the Roosevelt Bridge connecting D.C. and Virginia, get ready for that will last for months.

Starting Sunday, one lane of the bridge in each direction will close, reducing traffic capacity to two lanes in each direction.

Lane reductions on the Theodore Roosevelt Bridge through June. (Credit DDOT)

In addition, the eastbound Route 50 ramp from Arlington Boulevard will close.

The District Department of Transportation said drivers should expect the closings to continue through early June.

To avoid the ramp closure, posted detour signs will direct commuters in Virginia who are heading into D.C. to take the George Washington Parkway to the Arlington Memorial Bridge.

DDOT suggested drivers consider other ways to get in and out of the city, including by way of the Key Bridge.

The temporary closings are part of ongoing , which is expected to be finished in spring of 2028.

Construction work on the bridge, which aims to extend its life span by 20 to 30 years and improve mobility and safety for pedestrians and bicyclists, DDOT said, is projected to cost $128 million.

Get breaking news and daily headlines delivered to your email inbox by signing up here.

漏 2026 小萝莉影视. All Rights Reserved. This website is not intended for users located within the European Economic Area.

Michelle Basch

Michelle Basch is a reporter turned morning anchor at 小萝莉影视 小萝莉影视.

Federal 小萝莉影视 Network Logo
Log in to your 小萝莉影视 account for notifications and alerts customized for you.